FAQ
Answers to common questions from real pool buyers.
You don’t need a full plan to reach out. Whether you’ve already used the design tool or you’re just thinking about putting a pool in the ground, we’re happy to help. Use the form below to send us your design, ask a question, or request a callback. We’ll get back to you quickly, with real answers from people who actually build pools.
What’s included in the base price of a pool?
Base pricing includes:
- Excavation with full size machine all dirt removed day of excavation
- Temp fence in access area
- Replace up to 2 sections of fence and 1 gate self-closing self-latching
- 4 - #4 bar box beam at 10” on centers and #3 rebar at 10” on centers
- Gunite to meet or exceed ISPSC 2024 guidelines
- All equipment pads are poured concrete
- VGB Compliant main drain with dedicated suction 2.5” pipe
- Pebble top dual main drains
- Skimmer
- Marine grade silicone between pool and skimmer throat to prevent leaks
- 6 pool returns with 2” pipe for even flow and 1.5” through structure of pool
- Water stops on all returns to prevent leaks
- Cartridge Filter
- Variable Speed Pump
- Speed Set controls for pump
- 100-watt transformer
- LED low voltage pool light + light switch
- All electrical hook ups with GFCI breakers for all pumps
- 360 degree #8 Bond wire
- White, Blue, Grey, or Verde pebble interior
- 6” waterline tile
- Microfiber-reinforced, polymer modified mortar that helps prevent efflorescence
- Grout after 28 days over 7,500 PSI also Grout is stain and water resistant, water repellent and highly flexible
- Coping
- In-line Chlorine Tablet Feeder
- 400 square feet of concrete decking with # 3 rebar and fiber mesh with deck coating
- Tanning shelf
- 6’ bench
- 150’ of area drains
- Start up and Pool School
- Pole, brush, net, thermometer, test strips, vacuum head & hose
- Sodium Tetraborates - prevents algae growth and stabilizes alkalinity
- We balance the pool water over the 90 days of free maintenance
You’ll see a detailed breakdown inside the design tool before adding upgrades.
How long will my pool take to build?
30-working days (6 weeks)
There are a few exceptions to this.
- Rain Days any day that it rains in the greater Houston area we will add 1 day to the timeline due to delaying our crews at their current job sites.
- Inspections we will add 3 days to the timeline for any and all inspections that are needed.
- Any reroutes from the moment we must stop construction until we can continue, we will add 1 day for each day.
- Selections of all tile and coping, plaster etc., must be made prior to the pool being excavated.
- Change Orders add 3 days to the timeline.
- Customer not paying their pool builder the same day the money is due per the contract will add 1 day for every day payment is delayed.
- Any customer delays due to them going out of town etc., will add 1 day for every day and a minimum of 3 extra days to get back on the schedule once back in town to begin work again.
Can I change my design later?
You can update your design anytime before permits are submitted.
What if I find a better price elsewhere?
If you receive another quote with a better price, send the detailed proposal to Subs For Pools (not the builder). We will review it and show you where details may be missing or unclear.
Can I build a pool in a small yard?
Absolutely. Our design tool includes compact shapes that work well in smaller spaces. You’ll be able to preview layouts and sizes that fit your property without sacrificing features.
Can I finance just part of the project?
Yes. Many clients use a mix of financing and cash. You can finance the full build or just a portion, depending on your needs and the amount you’re approved to borrow. And where you would like your monthly payments to be.
Who actually builds my pool?
Subs For Pools controls the quality while utilizing experienced in-house crews along with a select group of trusted and carefully screened partners. You actually buy the pool from one of our vetted pool builders.
Is the design tool free to use?
Yes. You can start your pool, explore pricing, and save your cart without paying or scheduling a consultation. It’s all upfront.
What’s not included?
- City / County permits
- City requirements
- HOA application fees / deposits
- Underground issues not visible during inspection
- Any utility reroutes (if needed)
- Engineering (if required)
- Elevations variances around the pool area
- Tree removal
- Limited access excavation (smaller equipment)
- Sprinkler, sod, landscaping replacement
- Gas meter upgrades (if spa/heater)
- Plumbing/electrical runs beyond base allowances
- Additional zone charges may apply if you live outside of a 40 mile radius of Houston.
- Permit costs for city, county, or flood zones. The average city permit cost alone is $300 but will vary depending upon your city. Residences in a flood zone usually require additional permitting that can range from $300 to $3,600 on average depending upon location.
Still Have Questions?
Send us a message and we’ll answer honestly. No pressure. No pitch.
Prefer to Call?
We’re here to answer your questions: 713-821-1300
